| 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 The Loop  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Malibug End  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Rajarbug End  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Saidabad End  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Construction of 9m high reinforced earth wall for ramp  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Construction of 9m high reinforced earth wall for ramp  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Vibro-compaction of foundation for Ramp  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 A peer of the loop  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Contruction of the loop without interrupting  Trains or Vehicles  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Contruction of the loop without interrupting  Trains or Vehicles  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 1.9 km long Flyover at Khilgaon Rail and Road Intersection  | 
 
| 
 Construction of the Loop  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 450m long Arial Khan Bridge  | 
 
| 
 Lifting of Girder from Floating Platform  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 450m long Arial Khan Bridge  | 
 
| 
 Transport of Girder  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 450m long Arial Khan Bridge  | 
 
| 
 A view from the shore  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 450m long Arial Khan Bridge  | 
 
| 
 The Bridge  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 450m long Arial Khan Bridge  | 
 
| 
 Another View From Shore  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 450m long Arial Khan Bridge  | 
 
| 
 Completed Bridge  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Construction of Jetty  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Jetty and Access way  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Cement Loading Jetty  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Cement Loading Jetty  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Access way  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Construction of Foundation and other Facilities for Power Plant  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Lafarge Surma Cement  | 
 
| 
 Construction of Cooling Tower for Power Plant  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Feasibility Study for proposed Padma Bridge  
 | 
 
| 
 Sub-soil investigation using Cone Penetration Test (CPT).  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Feasibility Study for proposed Padma Bridge  | 
 
| 
 Sub-soil investigation using Cone Penetration Test (CPT).  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Chittagong Clinker Grinding Factory  | 
 
| 
 Construction of 25,000 Ton 30m Dia 38.5 m Tall Cement Silo using SLIPFORM  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Chittagong Clinker Grinding Factory  | 
 
| 
 Construction of 2x5,000 Ton Cement Silo using SLIPFORM  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Design and Construction of Jetty, Silo Scan Cement Factory  | 
 
| 
 73m x 14m Jetty with 8m x 72m catwalk with 120 Ton capacity Gantry Crane  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Design and Construction of Jetty, Silo Scan Cement Factory  | 
 
| 
 40,000 Ton Clinker Silo  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Design and Construction of Jetty, Silo Scan Cement Factory  | 
 
| 
 5000 Ton capacity, 31m high, 16m diameter silo constructed using SLIPFORM  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Cement Clinker Grinding Plant at Mongla  | 
 
| 
 Construction of 3x2,000 Cement Silo using SLIPFORM  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of Hyundai Cement Factory  | 
 
| 
 The Project  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of Hyundai Cement Factory  | 
 
| 
 Conveyor and Clinker unloading Crane  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of Hyundai Cement Factory  | 
 
| 
 Mill Building and Cement Silos  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of Hyundai Cement Factory  | 
 
| 
 Erection of Mill Building  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of Hyundai Cement Factory  | 
 
| 
 Construction of Jetty using on and offshore rotary drilling.  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 31m high 1,000,000 liter water reservoir in Maymenshing  | 
 
| 
 | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Design Built Construction of 36500 sqm 11 stroried factory building for Sinha Yarn Dying  | 
 
| 
 900mm diameter 51m deep pile foundation  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Medlar Garment Factory  | 
 
| 
 Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Medlar Garment Factory  | 
 
| 
 Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Medlar Garment Factory  | 
 
| 
 Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Medlar Garment Factory  | 
 
| 
 Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 3rd Buriganga Bridge  | 
 
| 
 Construction of 1200mm diameter 38m long drilled cast-in-situ piles by RCD method on River Buriganga, Dhaka.  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka  | 
 
| 
 Costruction of basement 2  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka  | 
 
| 
 | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur  | 
 
| 
 Piers and Girders  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur  | 
 
| 
 Piers and Girders  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur  | 
 
| 
 Girders and Abutment  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Finished Mill Building  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Finished Mill Building  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Finished Mill Building  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Finished Silo Foundation  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Finished Ball Mill Base  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Construction of Bin  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Costruction of Tunnel and Bins  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Construction of underground tunnel (-7m)  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Construction of underground tunnel  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur  | 
 
| 
 Costruction of Mill Building.  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.  | 
 
| 
 Borehole Drilling  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.  | 
 
| 
 Borehole Drilling  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Costruction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.  | 
 
| 
 Night time Borehole Drilling  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.  | 
 
| 
 Borehole Drilling  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.  | 
 
| 
 PDA Test using 10MT Drop Hammer  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.  | 
 
| 
 PDA Test using 10MT Drop Hammer  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of 420 nos 600mm dia RCC shore piles for Grameenphone CHQ Project, Dhaka  | 
 
| 
 Costruction of shore piles  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 800MT Static Maintained Load Test for LGED, Kanaighat, Sylhet  | 
 
| 
 Load Test  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink  | 
 
| 
 Costruction of Tower Foundation  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink  | 
 
| 
 Costruction of Tower Foundation  | 
 
 
 | 
 | 
 
 
 | 
 
 | 
 | 
 
 
 | 
| 
 | 
 
| 
 Drilling and Installation of 18inch diameter (borehole) 550ft long deep tube well in Dhaka.  | 
 
| 
 Drilling of Well.  | 
 
 
 | 
 | 
 
 
 | 
 
					 | 
 
					 | 
|  
					 |