|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
The Loop |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Malibug End |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Rajarbug End |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Saidabad End |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Construction of 9m high reinforced earth wall for ramp |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Construction of 9m high reinforced earth wall for ramp |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Vibro-compaction of foundation for Ramp |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
A peer of the loop |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Contruction of the loop without interrupting Trains or Vehicles |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Contruction of the loop without interrupting Trains or Vehicles |
|
|
|
|
|
|
|
1.9 km long Flyover at Khilgaon Rail and Road Intersection |
Construction of the Loop |
|
|
|
|
|
|
|
450m long Arial Khan Bridge |
Lifting of Girder from Floating Platform |
|
|
|
|
|
|
|
450m long Arial Khan Bridge |
Transport of Girder |
|
|
|
|
|
|
|
450m long Arial Khan Bridge |
A view from the shore |
|
|
|
|
|
|
|
450m long Arial Khan Bridge |
The Bridge |
|
|
|
|
|
|
|
450m long Arial Khan Bridge |
Another View From Shore |
|
|
|
|
|
|
|
450m long Arial Khan Bridge |
Completed Bridge |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Construction of Jetty |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Jetty and Access way |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Cement Loading Jetty |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Cement Loading Jetty |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Access way |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Construction of Foundation and other Facilities for Power Plant |
|
|
|
|
|
|
|
Lafarge Surma Cement |
Construction of Cooling Tower for Power Plant |
|
|
|
|
|
|
|
Feasibility Study for proposed Padma Bridge
|
Sub-soil investigation using Cone Penetration Test (CPT). |
|
|
|
|
|
|
|
Feasibility Study for proposed Padma Bridge |
Sub-soil investigation using Cone Penetration Test (CPT). |
|
|
|
|
|
|
|
Chittagong Clinker Grinding Factory |
Construction of 25,000 Ton 30m Dia 38.5 m Tall Cement Silo using SLIPFORM |
|
|
|
|
|
|
|
Chittagong Clinker Grinding Factory |
Construction of 2x5,000 Ton Cement Silo using SLIPFORM |
|
|
|
|
|
|
|
Design and Construction of Jetty, Silo Scan Cement Factory |
73m x 14m Jetty with 8m x 72m catwalk with 120 Ton capacity Gantry Crane |
|
|
|
|
|
|
|
Design and Construction of Jetty, Silo Scan Cement Factory |
40,000 Ton Clinker Silo |
|
|
|
|
|
|
|
Design and Construction of Jetty, Silo Scan Cement Factory |
5000 Ton capacity, 31m high, 16m diameter silo constructed using SLIPFORM |
|
|
|
|
|
|
|
Cement Clinker Grinding Plant at Mongla |
Construction of 3x2,000 Cement Silo using SLIPFORM |
|
|
|
|
|
|
|
Construction of Hyundai Cement Factory |
The Project |
|
|
|
|
|
|
|
Construction of Hyundai Cement Factory |
Conveyor and Clinker unloading Crane |
|
|
|
|
|
|
|
Construction of Hyundai Cement Factory |
Mill Building and Cement Silos |
|
|
|
|
|
|
|
Construction of Hyundai Cement Factory |
Erection of Mill Building |
|
|
|
|
|
|
|
Construction of Hyundai Cement Factory |
Construction of Jetty using on and offshore rotary drilling. |
|
|
|
|
|
|
|
Construction of 31m high 1,000,000 liter water reservoir in Maymenshing |
|
|
|
|
|
|
|
|
Design Built Construction of 36500 sqm 11 stroried factory building for Sinha Yarn Dying |
900mm diameter 51m deep pile foundation |
|
|
|
|
|
|
|
Medlar Garment Factory |
Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |
|
|
|
|
|
|
|
Medlar Garment Factory |
Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |
|
|
|
|
|
|
|
Medlar Garment Factory |
Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |
|
|
|
|
|
|
|
Medlar Garment Factory |
Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept |
|
|
|
|
|
|
|
3rd Buriganga Bridge |
Construction of 1200mm diameter 38m long drilled cast-in-situ piles by RCD method on River Buriganga, Dhaka. |
|
|
|
|
|
|
|
14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka |
Costruction of basement 2 |
|
|
|
|
|
|
|
14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka |
|
|
|
|
|
|
|
|
Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur |
Piers and Girders |
|
|
|
|
|
|
|
Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur |
Piers and Girders |
|
|
|
|
|
|
|
Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur |
Girders and Abutment |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Finished Mill Building |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Finished Mill Building |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Finished Mill Building |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Finished Silo Foundation |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Finished Ball Mill Base |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Construction of Bin |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Costruction of Tunnel and Bins |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Construction of underground tunnel (-7m) |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Construction of underground tunnel |
|
|
|
|
|
|
|
Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur |
Costruction of Mill Building. |
|
|
|
|
|
|
|
Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |
Borehole Drilling |
|
|
|
|
|
|
|
Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |
Borehole Drilling |
|
|
|
|
|
|
|
Costruction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |
Night time Borehole Drilling |
|
|
|
|
|
|
|
Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |
Borehole Drilling |
|
|
|
|
|
|
|
Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |
PDA Test using 10MT Drop Hammer |
|
|
|
|
|
|
|
Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet. |
PDA Test using 10MT Drop Hammer |
|
|
|
|
|
|
|
Construction of 420 nos 600mm dia RCC shore piles for Grameenphone CHQ Project, Dhaka |
Costruction of shore piles |
|
|
|
|
|
|
|
800MT Static Maintained Load Test for LGED, Kanaighat, Sylhet |
Load Test |
|
|
|
|
|
|
|
Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink |
Costruction of Tower Foundation |
|
|
|
|
|
|
|
Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink |
Costruction of Tower Foundation |
|
|
|
|
|
|
|
Drilling and Installation of 18inch diameter (borehole) 550ft long deep tube well in Dhaka. |
Drilling of Well. |
|
|
|
|
|
|