DEVELOPMENT CONSTRUCTIONS LTD.         FOUNDATION CONSULTANTS LTD.


| Who We Are | Our Scope of Service | Our Key Personnel | Our Founder | Equipments We Use | Our Laboratory |

 | Completed Construction Projects | List of Consultancy Services Provided | Photo Gallery | Brochure | Contact Us |

 |New Service: Drilling and Installation of Deep Tube Well |

 

SOME PHOTOGRAPHS OF OUR ACTIVITY                                                                                                                                                               

 

(CLICK ON PHOTOGRAPH TO ENLARGE)


1.9 km long Flyover at Khilgaon Rail and Road Intersection

The Loop


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Malibug End


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Rajarbug End


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Saidabad End


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Construction of 9m high reinforced earth wall for ramp


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Construction of 9m high reinforced earth wall for ramp


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Vibro-compaction of foundation for Ramp


1.9 km long Flyover at Khilgaon Rail and Road Intersection

A peer of the loop


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Contruction of the loop without interrupting Trains or Vehicles


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Contruction of the loop without interrupting Trains or Vehicles


1.9 km long Flyover at Khilgaon Rail and Road Intersection

Construction of the Loop


450m long Arial Khan Bridge

Lifting of Girder from Floating Platform


450m long Arial Khan Bridge

Transport of Girder


450m long Arial Khan Bridge

A view from the shore


450m long Arial Khan Bridge

The Bridge


450m long Arial Khan Bridge

Another View From Shore


450m long Arial Khan Bridge

Completed Bridge


Lafarge Surma Cement

Construction of Jetty


Lafarge Surma Cement

Jetty and Access way


Lafarge Surma Cement

Cement Loading Jetty


Lafarge Surma Cement

Cement Loading Jetty


Lafarge Surma Cement

Access way


Lafarge Surma Cement

Construction of Foundation and other Facilities for Power Plant


Lafarge Surma Cement

Construction of Cooling Tower for Power Plant


Feasibility Study for proposed Padma Bridge

Sub-soil investigation using Cone Penetration Test (CPT).


Feasibility Study for proposed Padma Bridge

Sub-soil investigation using Cone Penetration Test (CPT).


Chittagong Clinker Grinding Factory

Construction of 25,000 Ton 30m Dia 38.5 m Tall Cement Silo using SLIPFORM


Chittagong Clinker Grinding Factory

Construction of 2x5,000 Ton Cement Silo using SLIPFORM


Design and Construction of Jetty, Silo Scan Cement Factory

73m x 14m Jetty with 8m x 72m catwalk with 120 Ton capacity Gantry Crane


Design and Construction of Jetty, Silo Scan Cement Factory

40,000 Ton Clinker Silo


Design and Construction of Jetty, Silo Scan Cement Factory

5000 Ton capacity, 31m high, 16m diameter silo constructed using SLIPFORM


Cement Clinker Grinding Plant at Mongla

Construction of 3x2,000 Cement Silo using SLIPFORM


Construction of Hyundai Cement Factory

The Project


Construction of Hyundai Cement Factory

Conveyor and Clinker unloading Crane


Construction of Hyundai Cement Factory

Mill Building and Cement Silos


Construction of Hyundai Cement Factory

Erection of Mill Building


Construction of Hyundai Cement Factory

Construction of Jetty using on and offshore rotary drilling.


Construction of 31m high 1,000,000 liter water reservoir in Maymenshing


Design Built Construction of 36500 sqm 11 stroried factory building for Sinha Yarn Dying

900mm diameter 51m deep pile foundation


Medlar Garment Factory

Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept


Medlar Garment Factory

Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept


Medlar Garment Factory

Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept


Medlar Garment Factory

Design Build Construction of 27500 sqm - 8 storied factory building using prestressed flat slab design concept


3rd Buriganga Bridge

Construction of 1200mm diameter 38m long drilled cast-in-situ piles by RCD method on River Buriganga, Dhaka.


14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka

Costruction of basement 2


14 Storied with 2 Basement Commercial Building for DK Tower, Dhaka


Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur

Piers and Girders


Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur

Piers and Girders


Construction of 315m long PSC Girder Bridge at Shekhpur, Madaripur

Girders and Abutment


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Finished Mill Building


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Finished Mill Building


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Finished Mill Building


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Finished Silo Foundation


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Finished Ball Mill Base


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Construction of Bin


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Costruction of Tunnel and Bins


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Construction of underground tunnel (-7m)


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Construction of underground tunnel


Construction of 2nd Unit of Seven Ring Cement Factory at Kaliganj, Gazipur

Costruction of Mill Building.


Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.

Borehole Drilling


Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.

Borehole Drilling


Costruction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.

Night time Borehole Drilling


Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.

Borehole Drilling


Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.

PDA Test using 10MT Drop Hammer


Construction of 1000mm diameter 48m long cast-in-situ piles by RCD method for Meteorological Station at MoulaviBazar, Sylhet.

PDA Test using 10MT Drop Hammer


Construction of 420 nos 600mm dia RCC shore piles for Grameenphone CHQ Project, Dhaka

Costruction of shore piles


800MT Static Maintained Load Test for LGED, Kanaighat, Sylhet

Load Test


Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink

Costruction of Tower Foundation


Construction of civil structures for 7 nos Greenfield transmission towers for Banglalink

Costruction of Tower Foundation


Drilling and Installation of 18inch diameter (borehole) 550ft long deep tube well in Dhaka.

Drilling of Well.