DEVELOPMENT CONSTRUCTIONS LTD.         FOUNDATION CONSULTANTS LTD.


 

CONSTRUCTION PROJECTS WE HAVE COMPLETED                                                                                                            

 

A.        FLYOVER:

 

A1.      Employer                                 :           LOCAL GOVERNMENT ENGINEERING

DEPARTMENT.

 

            Principal Contractor                :           Development Constructions Ltd.

 

            Project :                                   :           Design Build Contract of Flyover at Khilgaon Rail

& Road Intersection, Length 1880m with 4 lane carriage way, in Dhaka City.

 

            Contract value                         :           Tk. 627.00 Million

           

 

            Contract period                       :           23/06/2001 to 31/12/2004.

 

 

 

B.        HIGHWAY BRIDGE:

 

B1.      Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

            Principal Contractor                :           HANIL CONSTRUCTION CO LTD.

 

Project                                     :           Construction of 450m long pre-stressed concrete

girder bridge (10 span of 45m) on 1m diameter, 57m long bored cast-in-situ R.C.C piles over River Arial khan at SRNDP, Contract No.-2, Mawa

(Char Janajat) - Bhanga including manufacture and driving of 47 m long 12 mm thick permanent steel casing.

 

            Contract value                         :           27,49,42,486.00 Tk. (Including cost of materials)                                                                             

Contract period                       :           January 2001 to January 2005.

 

 

 

 

 

 

 

B2.      Employer                                 :           ROAD AND HIGHWAYS DEPARTMENT

 

            Principal Contractor                :           TOWER ENTERPRISE LTD.

 

Project                                     :           Construction of 303.25 m long Pre-Stressed

                                                            concrete girder Bridge –at Mollahat over

                                                            Modhumoti River on Bhanga-Bhatiapara

                                    Gopalgonj-Mollahat Fakirhat-Tower Noapara-Khulna Road , Under Gopalgonj Road Division,

                                    Roads & Highways Department works comprising    

                                   

(1)        1000 mm dia 34 m long, 44 Nos. Bored Cast

            in Situ R.C.C pile.

(2)        1200 mm dia 48m long, 72 Nos. Bored Cast –in-Situ R.C.C pile, off –shore at 16 m water

(3)        43.32 m long 2.286 m. height 35 Nos. Pre-

            Stressed  Post Tensioning Girder.

 

            Contract Value                        :           2,20,00,000/- (Excluding cost of materials)

                                                                                                (30% completed)

 

            Contract Period                       :           21-11-98 to 20/06/2000

 

            Completion Date                     :           15.06.2000

 

B3.      Employer                                 :           CHINA HARBOUR ENGINEERING

CONSTRUCTION CO.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

            Project                                     :           Constructions of Contract No. – 3, Atrail &

Ayermari Bridge at Nalkha-Hatikamrul Bonpara New Road Project RRMP-III, Natore.

 

            Contract Value                        :           Tk. 117,833,486/-

 

            Contract Period                       :           15/03/99 to 31/03/2000.                                 

 

            Completion Date                     :           30.03.2000.

 

B4.    Employer                                   :           ROAD AND HIGHWAYS DEPARTMENT .

                                               

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of 92.96 m long Pre-Stressed concrete

                                                            girder Bridge on River Ghagor at 20 the K.M. of

Gopalgonj – Kotalipara-Paisarhat Road, Gopalgonj.            

Contract value                         :           Tk 2,76,24,165/55-

           

            Contract period                       :           14-07-97 to 28-02-99.

            Completion Date                     :           20-02-99.                                                                    

B5.      Employer                                 :           ROADS & HIGHWAYS DEPARTMENTS.

 

            Principal Contractor                :           SUNGJEE CONSTRUCTION CO. LTD.

 

            Project :                                   :           Construction of 188 Nos. 600 mm & 750 dia, Bored

                                                                        Cast-in-Situ pile for Str. No 68,69,70 & 72 at

                                                                        Jamuna Bridge Project, Contract No-3

 

            Contract value                         :           Tk. 60,00,000/00 (Excluding cost of materials)

 

            Contract period                       :           20/02/99 to 20/06/99

 

            Completion Date                     :           20.06.99

 

B6.     Employer                                  :           ROADS & HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           IRCON INTERNATIONAL

 

Project                                     :           Construction of 40 m long Kansat Canal Bridge at

                                                            Ch. 21+735 Sonamasjid- Shibganj-Nawabganj

                                                            Road (RRMP-II /WA)

             

            Contract value                         :           Tk 3,250,370.00

           

            Contract period                       :           05/12/97 to 05/06/98

 

B7.      Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           ANSAL PUBALI JOINT –VENTURE.

 

Project                                     :           Construction of 65.67 m long Road Bridge super

                                                            Structure with Pre-stressed concrete girders, R.C.C

                                                            deck-slab, R.C.C. cross-beam, railing, approach

                                                            slab, guide wall, piers and abutment,

 

Owner                                                 :           Roads & Highway Department.

 

            Contract value                         :           Tk.12,045,648-

 

            Contract period                       :           Dec. 93 to Dec. 1994.

 

B8.      Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           CHINA NATIONAL COMPLETE PLANT

EXPORT CORPORATION.IN DAWLATDIA-FARIDPUR-JHENAIDAH-KUSTIA ROAD.                                          

Project                                     :           Construction of 69.4 m Long Bridge with

                                                            pre-stressed concrete girders on 1.2 m diam 36m

                                                            long bored Cast-in-Situ pile foundation in RIP,

                                                            Contract-11, Jhenaidah (Structure No.46).

                       

            Owner                                     :           Roads and Highways Department.

 

           

Value of Completed work.     :           Tk. 21,620,003/00

            Contract Period                       :           April 1992 to 15th Sept, 1994.

 

Date of completion                 :           28.08.1994.

 

B9.       Employer                                :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           CHINA NATIONAL COMPLETE PLANT

EXPORT CORPORATION. IN DAWLATDIA-

FARIDPUR-JHENAIDAH-KUSTIA ROAD.

 

Project                                     :           Construction of 58 m Long Bridge with

                                                            pre-stressed concrete girders on 500 mm diam 22 m

                                                            long bored Cast-in-Situ pile foundation in RIP,

                                                            Contract-9, Faridpur (Structure No.20).

 

            Owner                                     :           Roads and Highways Department.

           

Value of Completed work.     :           Tk. 18,281,832/00

 

            Contract Period                       :           April 1992 to 15th June 1994.

 

Date of completion                 :           28.08.1994.

 

B10.     Employer                                :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           ACF- SWEEHONG JOINT VENTURE.

 

Project                                     :           Construction of Bored Cast –in-Situ R.C.C. Piles

                                                            (Rake & Vertical) Road Bridge under RIP, Contract

                                                            -4 (Dohazari-Lohagara Section). 

 

Type of Foundation                :           Bored Cast –in-Situ R.C.C. piles, R.C.C. Abutment,

                                                            piers, girders, deck slab, railing.

 

            Contract value                         :           Tk. 25 million.

 

            Year of completion                 :           October 1993 to- June 1993.

 

B11.    Employer                                 :           ROADS AND HIGHWAYS DEPARTMENT.

 

Principal Contractor                :           CHINA NATIONAL COMPLETE PLANT

EXPORT CORPORATION. IN DAWLATDIA-

FARIDPUR-JHENAIDAH-KUSTIA ROAD.

 

Project                                     :           Construction of 58 m Long Bridge with

                                                            pre-stressed concrete girders on 500 mm diam 22 m

                                                            long bored Cast-in-Situ pile foundation in RIP,

                                                            Contract-9, Faridpur (Structure No.16).

 

            Owner                                     :           Roads and Highways Department.

           

Value of Completed work.     :           Tk. 15,858,432/00

 

            Contract Period                       :           April 1992 to 15th June 1993.

Date of completion                 :           15.06.1993.

 

B12.    Employer                                 :           DIRECTORATE OF RELIEF AND

REHABILITATION. DHAKA, BANGLADESH.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of 280’-0” Long Bridge over the

                                                            River Mathabanga on Chudanga- Alamdanga Road. 

 

Type of Foundation                :           Bored Cast –in-Situ R.C.C. piles, R.C.C. Abutment,

                                                            piers, girders, deck slab, railing.

 

            Contract value                         :           Tk. 7.142 million.

 

            Year of completion                 :           January 92 to July 1993.

 

Execution period                     :           September 1990 to March 1992.

 

B13.    Employer                                 :           ROADS & HIGHWAY DIRECTORATE.

 

Principal Contractor                :           RDC-TPL, SINGAPORE.

 

Project                                     :           5 Nos. Bridge sub-structure on Shambugonj-

                                                            Haluaghat Highway under FRIP, 9 ADB

                                                            financed. Span 20 m to 77 m.

 

Type of Foundation                :           Pre-stressed concrete girders R.C.C. Slab, Pre-Cast

                                                            and cast-in-situ R.C.C piles.

 

            Contract value                         :           Tk. 46.09 million.

 

            Year of completion                 :           1992

 

Execution period                     :           September 1990 to March 1992.

 

B14.    Employer                                 :           ROADS & HIGHWAY DIRECTORATE.

 

Principal Contractor                :           INDIAN RAILWAY CONSTRUCTIONS LTD.   

 

Project                                     :           16.5 m long bridge at 4.15 and 9.15 Km Dhaka-

                                                            Chittagong Highway (Dawoud Kandi-Comilla

                                                            Section).

 

Type of Foundation                :           500 mm diameter 18 m long bored cast –in-situ

                                                            R.C.C. (Rake) piles R.C.C girders, deck slab.

                                                            crush barrier, railings,

 

            Contract value                         :           Tk. 16.5 million. (ADB Financed).

 

            Year of completion                 :           May, 1991.

 

Execution period                     :           December, 1989 to May 1990.

 

 

C. RAILWAY BRIDGE:

 

C1.      Employer                                 :           BANGLADESH RAILWAY.

 

            Principal Contractor                :           SAMWHAN –TSO-JOINT VENTURE.

 

            Project                                     :           Construction of 30m long (without splice) Pre-cast

RCC Driven Piles for 33 Nos. of Bridge in Division- 1 & V on Bangabandhu Bridge Railway Link Project. Contract –1 at Tangail

 

            Contract Value                        :           Tk. 52,385,060.00 (Excluding cost of materials)

                       

            Contract Period                       :           16/12/97 to 26/06/2000

 

Completion Date                     :           20.06.2000

 

C2.   Employer                                    :           JAMUNA MULTIPURPOSE BRIDGE

PROJECT AUTHORITY.

 

        Principal Contractor                    :           SAMWHAN CORPORATION, KOREA.

 

        Project                                         :           Construction of  Bridges & Culverts on JMB

                                                            Approach Road, Contract –3 & Contract –4,

                                                            comprising.

                                                a)         Construction of 12 Nos. Double Cell Box Culverts

                                                            of 5m x 5.9 m x 2.

                                                b)         7 Nos. Single Cell Box culverts, 5m x 5.9m.

                                                c)         12 Nos. Slab Bridges, Span 31 m founded on

                                                            4mx4mx28.4m Pre-cast R.C.C single length driven

                                                            pile.

                                                d)         9 Nos. Slab Bridges, Span 66m founded on.4mx4

                                                            x 28.4m Pre-cast R.C.C. single  length driven pile.   

                         

            Contract value                         :           Tk.57 million (Excluding cost of cement,

                                                                        aggregates & Re-bar, Batch Plant, Transit mixers).

           

Contract period                       :           January 95 –June, 1997.

 

C3.      Employer                                 :           BANGLADESH RAILWAY  (WEST)

 

Project                                     :           Rebuilding of Railway Bridge No.20A at 

                                                            Shambhuganj, Mymensingh.  

Type of Foundation                :           106 cm diameter cast –in-situ R.C.C piles and 50.8

                                                            cm diameter cast –in-situ R.C.C piles in wingwalls  

 

            Contract value                         :           Tk. 9.65 million.

 

            Year of completion                 :           March, 1990.

 

Execution period                     :           March 1989 to March 1990

 

 

C4.      Employer                                 :           BANGLADESH RAILWAY

 

Principal Contractor                :           DAEWOO CORPORATION.

 

Project                                     :           Railway Workshop at Parbatipur.

                       

Type of Foundation                :           450 mm diameter 18-24 m long bored cast –in-situ

                                                            R.C.C piles (925 numbers)

            Contract value                         :           Tk. 23.2 million.

           

            Contract Period                       :           Sept 1989 to March 1990      

 

            Year of completion                 :           February, 1990.

                                                                        (All piles were tested for integrity by pile integrity tester)

 

C5.      Employer                                 :           BANGLADESH RAILWAY  (West)

 

Project                                     :           Rebuilding of Railway Bridge No.20, in

                                                            Ishurdi-Sirajganj Section.

                                   

Type of Foundation                :           42” dia Cast –in-situ R.C.C Piles & 24” diam. Rake 

                                                            Piles.

 

            Contract value                         :           Tk. 9.50 million.

 

            Year of completion                 :           1989

 

Execution period                     :           March 1989 to October  1989

 

C6.      Employer                                 :           BANGLADESH RAILWAY 

 

Project                                     :           Rebuilding of Bridge No. 42 (Turag DN) in

                                                            between DACT. TGI Station.

                                   

Type of Foundation                :           42” dia 70’ –0” long Cast –in-situ R.C.C Piles

                                                            Construction of 2 piers & 1 Abutment with wing

                                                            walls.

 

            Contract value                         :           Tk. 9.75 million.

 

            Year of completion                 :           1989

 

Execution period                     :           January 1989 to May 1989.

 

 

 

 

 

C7.      Employer                                 :           BANGLADESH RAILWAY 

 

Project                                     :           Rebuilding of Bridge No. 119 in between Shat

                                                            Khamair & Kawraid Stations.

                                   

Type of Foundation                :           36” dia 70’ –0” long Cast –in- situ R.C.C Piles.

 

            Contract value                         :           Tk. 3.6 million.

 

            Year of completion                 :           1987

 

Execution period                     :           January 1986 to September 1987.

 

 

C8.      Employer                                 :           BANGLADESH RAILWAY (EAST)

 

Project                                     :           Bridge No. 207 on Feni –Laksham Section.

 

Type of Foundation                :           42” diam 75 ft. long 70 Nos. Cast –in-situ R.C.C.

                                                            Piles.   

 

            Contract value                         :           Tk. 10.4 million.

 

            Year of completion                 :           1979

 

            Execution period                     :           October 1978 to January 1979.

 

 

 

D.        SILO:

 

D1.      Employer                                 :           CHITTAGONG CEMENT CLINKER

GRINDING CO. LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

                       

            Project                                     :           Construction of one 25,000 ton capacity 30m diam

                                                                        38.5 m high Clinker Silo of pre-stressed concrete

construction using SLIP FORM at Chittagong.

 

            Contract value                         :           Tk. 62.8 Million.

 

            Contract period                       :           15/02/2001 to 15/02/2002

 

 

 

 

 

 

D2.      Employer                                 :           ASHUGONJ CEMENT INDUSTRIES LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of Cement Mill Building, Packing

Building, Cement Silo, Clinker Silo, Gypsum Storage, Jetty and Conveyor for Ashugonj Cement Industries Ltd. at Mongla Port Area, Mongla, Bagerhat.

 

            Contract Value                        :           Tk. 11,27,73,356.00

 

                Contract Period                       :           20/05/2000 to 20/07/2002

 

D3.      Employer                                 :           CHITTAGONG CEMENT CLINKER

GRINDING CO. LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

                       

Project                                     :           Construction of Gas Power Plant at Chittagong

                                                            Cement Clinker Grinding Plant Project.

 

            Contract value                         :           Tk. 3.00 Million.

 

            Contract period                       :           15/04/2002 to 15/06/2002

 

 

D4.      Employer                                 :           SHAH CEMENT INDUSTRIES LTD.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

            Project                                     :           3 Nos. Clinker Silos, capacity

25,000T/SILO, diameter 25m, height

57m using SLIPFORM for Shah Cement Industries

Ltd., at Muktarpur, Munshigonj.

 

            Contract Period                       :           January 2002 to August 2002.

 

D5.      Employer                                 :           SHAH CEMENT INDUSTRIES LTD.,

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

            Project                                     :           Construction of 3 Nos Cement Silo wall & roof

including Civil work using slip form for Shah Cement Industries Ltd., at Muktarpur, Munshigonj.

 

            Contract Period                       :           July 2001 to November 2001.

 

 

 

 

 

 

D6.      Employer                                 :           SCANCEM CEMENT INDUSTRIES LTD.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           a) Construction of One No. 40,000 Ton capacity

    Clinker Silo.

b) Construction of Two Nos. 5,000 Ton Capacity

    Cement Silo.

c) Construction of One Nos. 1,200 Ton Capacity

    Barge Berthing Jetty at Dhaka Grinding Plant

    Project, Tatki, Rupgonj, Narayangonj.

 

            Contract value                         :           Tk.152.132 million

 

            Contract period                       :           15/11/99 to 30.11.2000

 

            Completion Period                  :           30.11.2000.

 

D7.      Employer                                 :           CHITTAGONG CEMENT CLINKER

GRINDING CO. LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

            Project                                     :           Construction of Cement Packing Building for

                                                                        Factory Unit –II of CCCGCL at Chittagong.

 

            Contract value                         :           TK 26,000,00/00.

 

            Contract period                       :           04/04/98 to 19/10/98.

 

            Completion Date                     :           15/10/98                                                                     

 

 

E.                 PILING WORKS:

 

E1.       Employer                                 :           WARTSILLA BANGLADESH LIMITED.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project:                                                Construction 244 piles of 600mm diameter and 32 m length, and civil installation work for site preparation, site works, substructure, and sewage for Surma Energy Ltd. Chatak

 

Contract value                         :           6,63,00,000.00

           

Contract Period                       :           April 2004 to December 2004.

 

 

 

 

 

E2.       Employer                                 :           UNIVERSITY OF SCIENCE &

TECHNOLOGY CHITTAGONG.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

[

Project                                     :           Execution of Piling work for construction of 500-

Bed Bangabandhu Memorial Hospital at Foy's Lake at Chittagong.

 

            Contract Value                        :           Tk. 2,39,78,747.00

 

            Contract Period                       :           July 2001 to January 2002.

 

E3.       Employer                                 :           HANIL CONSTRUCTION CO., LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD

 

Project                                     :           Constructions of Bored Cast-in-Situ R.C.C. piles for

                                                            Saidabad Water Treatment Plant Project,

Contract – 4B, Saidabad.

 

            Contract Value                        :           Tk. 51,698,190/-

                                                                         (Excluding cost of materials).

 

            Contract Period                       :           24/04/99 to 24/04/2000.                                 

 

            Completion Date                     :           20.04.2000.

 

E4.    Employer                                   :           BROWN & ROOTS BANGLADESH LTD.

 

[                                               

Project                                     :           Driving of Tubler Pile at Sangu Onshore Terminal

                                                            at Chittagong.

 

Principal Contractor                :           CIVIC ENGINEERING CO.

 

            Contract value                         :           Tk 30,00,000/- (Excluding cost of steel tube pile)

                                                                        aggregates & Re-bar, Batch Plant, Transit mixers).

           

Contract period                       :           17/08/97 to 15/11/97

 

E5.      Employer                                 :           BANGLADESH POWER DEVELOPMENT

                                                                        BOARD.

 

Project                                     :           River Crossing Tower Foundation of 132 KV

                                                            Power Transmission Line at Labukhali, Barishal

                                                            Patuakhali.

 

Type of Foundation                :           30" dia ( 750mm) 29m long Cast-in-Situ R.C.C. Piles.

 

Principal Contractor                :           THE ENGINEERS & ENGINEERS.

 

            Contract value                         :           Tk.10 million

            Contract period                       :           May –July 1995.

E6.       Employer                                 :           DEPARTMENT OF PUBLIC HEALTH

ENGINEERING BANGLADESH.

 

Project                                     :           Two numbers 2,20,000 gal. over head water

                                                            reservoirs. (Two number ) at Mymensingh.   

                                   

Type of Foundation                :           600 mm diameter 45 m long bored cast –in-situ

                                                            R.C.C. poles 13.6 m diam 10.7m high R.C.C.

                                                            reservoirs or 9m diam, 29.54 m high R.C.C. shaft.

 

            Contract value                         :           Tk. 21.8 million. (ADB Financed).

 

            Year of completion                 :           April, 1990.

 

Execution period                     :           Sept, 1988-April 1991.

 

E7.       Employer                                 :           POWER DEVELOPMENT BOARD .

 

Principal Contractor                :           TOYOMENKA KAISHA LTD. JAPAN.

 

Project                                     :           Kaptai-Bara Aulia 132KV Trans. tower(86Towers).

 

Type of Foundation                :           16” dia (400 m) dia. 15 m long cast-in-situ R.C.C Piles.

                                                                       

            Contract value                         :           Tk. 15.50 million

 

            Year of completion                 :           September 1985 to June 30, 1986.

 

            Execution period                     :          

 

E8.       Employer                                 :           CHITTAGONG UREA FERTILIZER LTD.

 

Project                                     :           Manufacturing & Driving of Pre-cast R.C.C. Piles

                                                            at Housing complex at CUFL, Rangadia,

                                                            Chittagong.

 

Type of Foundation                :           1600 Piles.

 

            Contract value                         :           Tk. 30.2 million

 

            Year of completion                 :           1986

 

            Execution period                     :           August 1985 to February 1986.

E9.       Employer                                 :           M/S. BHUIYAN & SONS

 

Project :                                   :           22” dia 60-0” long Cast –in- situ R.C.C. piles.

for 16-storied Commercial Bldg. at Plot No.28, Dilkusha C/A., Dhaka.

 

            Contract value                         :           Tk. 1.9 million

 

            Year of completion                 :           1985

 

           Execution period                      :           July to September 1985 (2 months.)

 

E10.     Employer                                 :           POWER DEVELOPMENT BOARD.   

 

Project                                     :           Proposed River Crossing Towers at Atri

Baki River at Khulna.

 

            Type of Foundation                :           16 ” dia 60-0” long Cast –in- situ R.C.C. piles.

                                               

            Contract value                         :           Tk. 6.0 million

 

            Year of completion                 :           1985

 

           Execution period                      :           April 1985 to July 1985.

 

E11.     Employer                                 :           BANGLADESH POWER DEVELOPMENT BOARD 

 

            Principal Contractor                :           SHOVAN BROTHERS, DHAKA

           

Project                                     :           Construction of Foundation of River Crossing

Towers on the River Meghna and Gumati at

Daudkandi.

 

            Type of Foundation                :           16” dia 50 ft. long Cast –in- situ R.C.C. piles.

           

            Contract value                         :           Tk. 3.0 million

 

            Year of completion                 :           1983-84

 

            Execution period                     :           September  1983. to April 1984.

 

E12.     Employer                                 :           POWER DEVELOPMENT BOARD

           

            Principal Contractor                :           ALSTHOM ATLANTIQUE, FRANCH/UNION

                                                                        MERCANILE AGENCIES BANGLADESH.

           

Project                                     :           25 MW Barisal Gas Turbine Power Station Project.

 

            Type of Foundation                :           Pile Foundation & other Civil works.

           

            Contract value                         :           Tk. 10.0 million

 

            Year of completion                 :           1983-84

 

            Execution period                     :           July 1983 to January 1984

E13.     Employer                                 :           BANGLADESH POWER DEVELOPMENT BOARD.   

 

Principal Contractor                :           TOYOMENKA KAISHA LTD., Japan.

 

Project                                     :           Bheramara-Faridpur-Madaripur-Barisal 132 KV

                                                            Trans. Line/Towers (115Towers)                   

 

            Type of Foundation                :           18” dia 50-0” long Cast –in- situ R.C.C. piles.

                                                                        51,211 rft.

 

            Contract value                         :           Tk. 15.40 million

 

            Year of completion                 :           1983-84

            Execution period                     :           March 1983 to May 1984.

E14.     Employer                                 :           POWER DEVELOPMENT/ AFCL.   

 

Project                                     :           River Crossing Towers at Lata

                                                            River and at Muladi, Barisal.

 

            Type of Foundation                :           16” dia 40’-0” long Cast –in- situ R.C.C. piles.                                                                    

            Contract value                         :           Tk. 10.0 million

 

            Year of completion                 :           1984

 

Execution period                     :           June 1984 to November 1984.

 

E15.     Employer                                 :           CHITTAGONG WATER SUPPLY &

SEWERAGE AUTHORITY.

 

Project                                     :           Extension of Kalurghat Iron Removal Plant C-14.

                                                            Rapid Gravity Filler with Simultaneous air and

                                                            water scour.

 

            Type of Foundation                :           Bored cast –in-situ R.C.C. piles.

           

            Contract value                         :           Tk. 62,00,00- US $ 2,62,000

 

            Execution period                     :           November 1983. to January 1984.

 

 

 

E16.     Employer                                 :           DEPARTMENT OF PUBLIC HEALTH ENGINEERING

 

Principal Contractor                :           ALSTHOM ATLANTIQUE, FRANCH/UNION

                                                                        MERCANILE AGENCIES BANGLADESH.

 

Project                                     :           Eusufzai Brothers. at Dhaka Overhead Water Tank

                                                            at Chapai Nowabgonj, Rajshahi 

 

            Type of Foundation                :           12”x12”x45”-0 Pre-Cast R.C.C. Piles.

           

            Contract value                         :           Tk. 2.5 million

 

            Year of completion                 :           1983-84

 

            Execution period                     :           November 1983. to January 1984.

 

 

 

 

 

 

E17.     Employer                                 :           LALBAGH SHAHI MOSQUE COMMITTEE,

DHAKA.   

 

Project                                     :           Minar of Lalbagh Shahi Mosque, Dhaka.

 

            Type of Foundation                :           16” dia 50 ft. long Cast –in- situ R.C.C. piles.

           

            Contract value                         :           Tk. 6.5 million

 

            Year of completion                 :           1983

 

            Execution period                     :           October 1982.

E18.     Employer                                 :           ROYAL NAPAL EMBASSY.

 

Principal Contractor                :           NIRMAN INTERNATIONAL LTD., DHAKA.

 

Project                                     :           Napal Embassy Project Complex at Baridhara

Gulshan, Dhaka.

 

            Type of Foundation                :           14”x14”x55 ft.12”x12”x45 ft. Pre-cast R.C.C. Piles

 

            Contract value                         :           Tk. 6.5 million

 

            Year of completion                 :           1983

 

Execution period                     :           March 1983 to May 1983.

 

E19.     Employer                                 :           BANGLADESH T & T BOARD, DHAKA   

 

Project                                     :           20-Storied Admn. Building at 36/1, Mymensingh

                                                            Road, Dhaka. 

 

            Type of Foundation                :           20” dia 6000 rft. 16” dia 3000 rft. Cast-in –situ

                                                                        R.C.C Piles.

           

            Contract value                         :           Tk. 3.0 million

 

            Year of completion                 :           1982

 

            Execution period                     :           March 1980 May 1982.

 

E20.     Employer                                 :           UTTARA MOTORS LTD., Chittagong.   

 

Project                                     :           Multi-storied Commercial Bldg. at  Agrabad.

                                                            C.A., Chittagong.        

 

            Type of Foundation                :           16” dia 53 ft. long Cast-in-situ R.C.C. piles 4320rft.                        

            Contract value                         :           Tk. 1.5 million

 

            Year of completion                 :           1982

 

            Execution period                     :           August  1982 to September 1982.

                                                                                                                       

 

 

E21.     Employer                                 :           BANGLADESH POWER DEVELOPMENT BOARD 

 

            Project                                     :           Anchor & River Crossing Towers of 132 KV           

                                                                        Tr. line on Karnafully & Halda Rover.

            Type of Foundation                :           16” dia 40’/45’ long 200 Nos. Cast –in-Situ R.C.C Piles.

 

            Contract value                         :           Tk. 5.0 million

            Year of completion                 :           1981.

 

            Execution period                     :           March  1980 to May 1981.

 

E22.     Employer                                 :           BANGLADESH POWER DEVELOPMENT BOARD 

 

Project                                     :           132 KV Tr. Tower of GDPD between Posthogola &

                                                            Siddhirgonj.

 

            Type of Foundation                :           Pre-Cast R.C.C. Pile 12”x12”, 40 ft. long

            Contract value                         :           Tk. 3.5 million

 

            Year of completion                 :           1981

 

            Execution period                     :           April  1981 to May 1981.

 

 

E23.     Employer                                 :           BANGLADESH PUBLIC WORKS DEPARTMENT.   

 

Project                                     :           National Library at S.B. Nagar, Dhaka.

 

            Type of Foundation                :           16”/18” dia 45”/55” long 400 Nos. Cast –in-Situ

                                                                        R.C.C Piles.

 

            Contract value                         :           Tk. 6.0 million

 

            Year of completion                 :           1980-81

 

            Execution period                     :           August  1980 to March 1981.

 

E24.     Employer                                 :           BANGLADESH PUBLIC WORKS DEPARTMENT.   

 

Project                                     :           TIVT for Women at Eskaton Garden, Dhaka.

 

Type of Foundation                :           18” dia 53 ft. long 266 Nos.Cast-in-Situ R.C.C.

Piles (1st Phase) 105 Nos. (2nd phase).

           

            Contract value                         :           Tk. 2.7 million

 

            Year of completion                 :           1980-81

 

            Execution period                     :           December 1980 to April 1981.

                                                                                   

 

 

 

 

E25.     Employer                                 :           BANGLADESH PUBLIC WORKS DEPARTMENT.   

 

Project                                     :           Chemical Water Treatment Plant 110 MW Power

                                                            Station, Khulna.

 

            Type of Foundation                :           20” dia 70 ft. long 197 Nos. Cast-in-Situ R.C.C Piles.

           

            Contract value                         :           Tk. 4.3 million

 

            Year of completion                 :           1981

 

            Execution period                     :           May 1981 to September 1981.

E26.     Employer                                 :           BANGLADESH AGRICULTURE RESEARCH

INSTITUTE  

 

Project                                     :           Academic, Admn. and Residential Building at

                                                            BARI, Hathazari, Chittagong.

 

            Type of Foundation                :           16” dia 40 ft. long 1100 Compaction sand pile.

 

            Contract value                         :           Tk. 1.4 million

 

            Year of completion                 :           1980.

 

            Execution period                     :           February 1980 to July 1980.

 

E27.     Employer                                 :           BANGLADESH PUBLIC WORKS DEPARTMENT

 

            Project                                     :           FWVTS, Boyra, Khulna.                   

 

            Type of Foundation                :           8” dia 25 ft. long 2000 Nos. compaction sand pile.

 

            Contract value                         :           Tk. 1.4 million

 

            Year of completion                 :           1979

 

            Execution period                     :           March  1979 to June 1979.

 

E28.     Employer                                 :           MILITARY ENGINEERING SERVICES,

BANGLADESH  ARMY.

 

            Project                                     :           100 Beded Hospital Building (Nursing Unit)

                                                                        Chittagong Cantt.

 

            Type of Foundation                :           8” dia 35 ft. long compaction sand pile.

 

            Contract value                         :           Tk. 1.4 million

 

            Year of completion                 :           1978

 

            Execution period                     :           September 1978 to December 1978.

 

F.         JETTY:

 

 

F1.       Employer                                 :           ELPIJI MALAYSIA –BANGLADESH LIMITED.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project :                                   :           Civil construction works of LPG Depot Facilities,

Reclamation & Embankment Profession work & Jetty for ELPIJI-Malaysia- Bangladesh at Mongla Port. Mongla, Bagerhat.

 

            Contract value                         :           Tk. 7,91,82,000/00

 

            Contract period                       :           02/01/99 to 30/03/2001

 

            Completion Date                     :           20/03/2001

 

F2.      Employer                                 :           PUBLIC WORKS DEPARTMENT.

                                                                        (FOREIGN OWNED COMPANY IN BANGLADESH)

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Re- pair and Reconstruction of Cyclone Damaged

                                                            Jetty at Marine Academy, Juldia and extension Jetty

                                                            at Patenga, Chittagong.

 

            Contract value                         :           Tk.20 million

 

            Contract period                       :           August 1995,-December 1996.

 

F3.    Employer                                   :           MONGLA PORT AUTHORITY

 

Project                                     :           Construction of Vessel Birth Jetty.

 

Principal Contractor                :           M/S. Metropolitan Engineers.

 

            Contract value                         :           Tk.10 million

 

            Contract period                       :           January, 1995 to May, 1995.

 

F4.       Employer                                 :           SENA KALYAN SHANGSTHA.

 

Principal Contractor                :           M/S. EASTERN ENGINEERS (CTG.)LTD.

 

Project                                     :           Construction of 600 mm dia/50 m Long Bored Cast-  

in-Situ R.C.C. Piles vertical & Rake for Jetty of Mongla Cement Factory. 

 

            Contract value                         :           Tk. 12 million.

 

            Contract period                       :           July 1993 to February1994.

G.        INDUSTRY:

 

G1.      Employer                                 :           SINHA YARN DYEING & FABRICS LTD.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD

 

            Project :                                   :           Design Build Contract of  10 Storied Factory

Building with pre-stressed concrete flat slab for  M/S. Sinha Yarn Dyeing & Fabrics Ltd.

at Kanchpur, Narayangonj.

 

            Contract value                         :           Tk.11,48,82,469.00

           

Contract period                       :           10/01/2001 to 21.09.2002

 

G2.      Employer                                 :           HYUNDAI ENGINEERIN & CONSTRUCTION

                                                                        CO. LTD.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of Hyundai Cement

                                                            3rd Cement expansion project at Meghna

Ghat Narayangonj, Bangladesh.

 

            Contract value                         :           Tk.3,38,39,517.00

 

            Contract period                       :           04/11/2000 to 10.01.2001

 

            Completion Date                     :           07/01/2001.

 

G3.      Employer                                 :           S.K.S. GARMEMTS.

 

            Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD

 

            Project                                     :           Constructions of 5 Storey Factory Building with

                                                                        Bored pile and pre-stressed concrete FLAT SLAB

                                                                        (7omx30m) for SKS Garments at Hemayetpur, Savar.

 

            Contract Value                        :           Tk. 11,04,00,000/00

 

            Contract Period                       :           30/10/97 to 30/04/99                          

 

            Completion Date                     :           15.04.99.

 

G4.      Employer                                 :           BOMBAY SWEETS & CO.LTD.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of Tricepack Main Factory Building

                                                            for Bombay Sweets & Co. Ltd., at Kanchpur.

                                                            Narayanganj.

Contract value                         :           Tk. 25,243,980/00

G5.      Employer                                 :           R.M. COLD ROLLED STEEL MILLS LTD.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

                                               

Project                                     :           Design, Fabrication and installation of HOLLOW

                                                            SHAFT FOUNDATION (materials supplied free of

                                                            cost by employer)at Kumira,Chittagong.(Innovated

Foundation system by us).

                                                                                                             

            Contract value                         :           Tk 6,450,000.00 (Excluding cost of materials0

           

            Contract period                       :           17/12/97 to 15/7/98

 

G6.      Employer                                 :           MARK GROUP OF INDUSTRIES &

                                                                        COMPANIES.

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of 20” duan, 55’-0” long Bored Cast –

                                                            in –Situ R.C.C. Piles for Proposed Multi-Story

                                                            Factory Complex at Plot No. 54,55,56, DEPZ,

                                                            Savar.

 

Contract value                         :           Tk.15 million

 

            Contract period                       :           April  1997, to August 1997.

 

G7.      Employer                                 :           HYUNDAI CEMENT (BD) CO. LTD. (100%

                                                                        FOREIGN OWNED COMPANY IN BANGLADESH)

 

Principal Contractor                :           DEVELOPMENT CONSTRUCTIONS LTD.

 

Project                                     :           Construction of Cement Factory at Meghna Ghat

                                                            Narayangonj, Bangladesh. Work consists of Piling

                                                            work of Jetty, Building Foundation & Roads

                                                            Boundary Walls, Water Tank & Water Basin,

                                                            Clinker & Gypsum Silo, Cement Silo, Cement Mill

                                                            Building (Steel Structures), Packing House Building

                                                            (Steel Structures), and Jetty.

 

            Contract value                         :           Tk.200 million

 

            Contract period                       :           February,-December 1995.

 

G8.      Employer                                 :           BANGLADESH CHEMICAL INDUSTRIES

CORPORATION.

 

Principal Contractor                :           HCG. HOLLAND.

 

Project                                     :           12000 Phosphoric Acid Tank at TSP Complex,

                                                            Chittagong.

Type of Foundation                :           500 mm diam. 17 m long Cast –in- situ R.C.C piles.

                                                                       

            Contract value                         :           Tk. 3.6 million

 

            Year of completion                 :           1986

 

            Execution period                     :           July to September, 1986.

 

G9.      Employer                                 :           BANGLADESH TEXTILE MILLS

CORPORATION, DHAKA.

 

            Project                                     :           National Cotton Mills Ltd. Fauzderhat, Chittagong,

 

            Type of Foundation                :           14”/15” dia 40 ft. long 320 Nos. Cast –in-situ R.C.C Piles

 

            Contract value                         :           Tk. 3.0 million.

 

            Year of completion                 :           1978.

 

            Execution period                     :           December 1977 to March 1978.

 

 

 

H.        WATER SUPPLY:

 

 

H1.      Employer                                 :           CHITTAGONG WATER SUPPLY SEWERAGE

AUTHORITY.

 

Project                                     :           Construction of Trunk Pipe Line Mohara-Battali-

                                                            Hill-WASA Patenga under Second Chittagong

                                                            Water Supply Project-IDA Credit No. 1001 –BD.

 

Type of Foundation                :           600 m to 1200 mm Ductile Iron Pipes and fittings;

                                                            Installation, testing and commissioning Depth range

                                                            8’ –0” to 20’-0”, 25.5 Km inclusive 16” dia steel

                                                            Pile in 25 ft water on Bangshai Khal, Kalurghat,

                                                            Chittagong for pipe bridge.

 

            Contract value                         :           Tk. 44.246 million, US $. 15 million.

 

            Year of completion                 :           1987

 

            Execution period                     :           May 1984 to September 1987.

 

 

 

 

 

I.          OTHERS:

 

                                                                                                                       

1.         Employer                                 :           MES (NAVY)

 

Project                                     :           4-storied E –Type Quarter at Chittagong. 

           

            Contract value                         :           Tk. 4.0 million

 

            Year of completion                 :           1984

 

            Execution period                     :           January1984 to May 1984.

                       

2.         Employer                                 :           MES (Navy)

 

Project                                     :           4-storied E –Type Quarter at Chittagong. 

 

            Contract value                         :           Tk. 4.0 million 

 

            Year of completion                 :           1984.

 

            Execution period                     :           February 1984 to June 1984.

 

                                                                                                                       

3.         Employer                                 :           MR. K. RAHMAN KHULNA.   

 

Project                                     :           7-storied Bldg.with Basement Floor

Provision for underground Reservoir & Car Park at KDA C.A.Khulna.

 

            Contract value                         :           Tk. 20.0 million

 

            Year of completion                 :           1981-82

 

            Execution period                     :           June 1981 to August 1982.

 

 

4.         Employer                                 :           MES (Navy) 

 

Project                                     :           Construction of Parade Ground Complex at CDB,

                                                            Patenga, Chittagong. 

 

            Contract value                         :           Tk. 10.5 million

 

            Year of completion                 :          

 

            Execution period                     :           March to December 1987.

 

 

5.         Employer                                 :           US EMBASSY. 

 

Principal Contractor                :           DAELIM INDUSTRIAL CO. SOUTH KOREA,

 SOUTH KOREA.

 

Project                                     :           Multi –storied US Embassy Building Baridhara,

                                                            Dhaka.

 

Type of Foundation                :           Bored 24” dia Cast –in- situ R.C.C Pile

 

            Contract value                         :           Tk. 10.8 million.

 

            Year of completion                 :           1986

 

            Execution period                     :           March 1986 to September 1986.